{"id":24643,"date":"2016-06-29T15:22:00","date_gmt":"2016-06-29T15:22:00","guid":{"rendered":"https:\/\/staging.kepner-tregoe.com\/kepner-tregoe-tools-and-process-validation\/"},"modified":"2025-07-10T14:39:49","modified_gmt":"2025-07-10T14:39:49","slug":"kepner-tregoe-tools-and-process-validation","status":"publish","type":"post","link":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/","title":{"rendered":"Kepner-Tregoe Tools and Process Validation"},"content":{"rendered":"<p>Controlling change is daunting, but controlling process change can be significantly improved by taking a Kepner-Tregoe (KT) process approach.<\/p>\n<p>Many\u00a0organizations take advantage of KT methods in activities related to process change, particularly process validation<strong>\u2014<\/strong><em>the collection and evaluation of data from process design through commercial production.<\/em> For example, when project planning for process installation kicks in, Kepner-Tregoe tools provide a reliable way to support process validation. The KT methods reduce the set backs that too often seem inevitable in relation to change.<\/p>\n<p>The following tools offer step-by-step procedures for addressing key issues during process validation:<\/p>\n<p><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00b7 \u00a0<\/strong>\u00a0Situation Appraisal: <em>What is going on?<\/em><\/p>\n<p><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00b7\u00a0<\/strong>\u00a0 Decision Analysis: <em>What is the best, balanced choice?<\/em><\/p>\n<p><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00b7\u00a0<\/strong>\u00a0 Potential Problem\/Opportunity Analysis: <em>What risks or favorable conditions could arise?<\/em><\/p>\n<p><strong>\u00a0 \u00a0 \u00a0 \u00a0 \u00b7\u00a0<\/strong>\u00a0 Problem Analysis: <em>What went wrong and how can it be resolved?<\/em><\/p>\n<p>The systematic KT methods help project teams to think through the project plan, manage day-to-day delivery and ensure that the plan delivers the anticipated results. \u00a0The fully documented KT methods promote and support <strong><em>three key areas of process validation<\/em><\/strong><em>: planning, installation and qualification<\/em>.<\/p>\n<h4>1. \u00a0Planning the Process Installation<\/h4>\n<p>Once the process has been designed and approved, Installation Qualification (IQ) validates that the equipment adheres to specifications and is properly installed according to plan. During IQ, Situation Appraisal (SA) can surface concerns with using specific equipment or materials. Decision Analysis (DA) identifies the best-fit equipment and materials for the design. Potential Problem Analysis (PPA) is used to analyze risk or what could go wrong with the installation. Once the PPA is developed, it is easier to execute an installation that has potential problems identified, corrective actions taken, and contingencies planned if problems do arise.<\/p>\n<h4>2. \u00a0Planning Operational Qualification<\/h4>\n<p>Operational Qualification (OQ) confirms that the process functions in the way it was designed\u2014equipment is run to ensure function and the process operated to make sure it is correct. For example, OQ confirms that the motors rotate in the correct direction, valves are installed correctly, piping systems are the correct size and material, etc. During the OQ project design, Situation Appraisal (SA) surfaces concerns about starting equipment for the first time. PPA is used to identify any potential problems with starting the new equipment\u2014and their causes; it is used to take preventive actions and to set contingent actions in case problems should arise.\u00a0 This sounds a lot like a Failure Modes Effect Analysis (FMEA) but it is a higher level\u2014quickly identifying any concerns that may need a deeper level of scrutiny. During the roll out of the project, if any problems arise, Problem Analysis (PA) gets you to root cause efficiently and PPA helps to prevent recurrence.<\/p>\n<h4>3. \u00a0Planning Process Qualification<\/h4>\n<p>Process Qualification ensures that the process actually produces the product to spec, in terms of quantity, sizes, quality and other factors. Situation Appraisal helps to surface concerns that may exist with starting to run the equipment\u2014as well as during long-term use. Risk analysis with KT PPA identifies and prevents problems\u2014and sets contingent actions should problems arise\u2014during process startup and long-term use. Root cause analysis with KT Problem Analysis has proven effective should issues arise during manufacturing or laboratory testing of the product. KT Problem Analysis defines questions that when answered provide the data needed to write the Investigation report proving identification of root cause.<\/p>\n<p>There is a lot of work that goes into the IQ, OQ and PQ phases of a validation.\u00a0 Validations can take on many forms from very simplistic to the extremely complicated. This short synopsis addresses a few of the areas of validations that are easily enhanced by the systematic, well-documented approach of KT methodology.<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Controlling change is daunting, but controlling process change can be significantly improved by taking a Kepner-Tregoe (KT) process approach. Many\u00a0organizations take advantage of KT methods in activities related to process change, particularly process validation\u2014the collection and evaluation of data from process design through commercial production. For example, when project planning for process installation kicks in, [&hellip;]<\/p>\n","protected":false},"author":17,"featured_media":496,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"ppma_author":[],"class_list":["post-24643","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-uncategorized"],"acf":[],"yoast_head":"<!-- This site is optimized with the Yoast SEO Premium plugin v25.6 (Yoast SEO v27.4) - https:\/\/yoast.com\/product\/yoast-seo-premium-wordpress\/ -->\n<title>Kepner-Tregoe Tools and Process Validation - Kepner-Tregoe<\/title>\n<meta name=\"description\" content=\"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.\" \/>\n<meta name=\"robots\" content=\"noindex, follow, max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n<meta property=\"og:locale\" content=\"nl_NL\" \/>\n<meta property=\"og:type\" content=\"article\" \/>\n<meta property=\"og:title\" content=\"Kepner-Tregoe Tools and Process Validation\" \/>\n<meta property=\"og:description\" content=\"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.\" \/>\n<meta property=\"og:url\" content=\"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/\" \/>\n<meta property=\"og:site_name\" content=\"Kepner-Tregoe\" \/>\n<meta property=\"article:published_time\" content=\"2016-06-29T15:22:00+00:00\" \/>\n<meta property=\"article:modified_time\" content=\"2025-07-10T14:39:49+00:00\" \/>\n<meta property=\"og:image\" content=\"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg\" \/>\n\t<meta property=\"og:image:width\" content=\"1600\" \/>\n\t<meta property=\"og:image:height\" content=\"900\" \/>\n\t<meta property=\"og:image:type\" content=\"image\/jpeg\" \/>\n<meta name=\"author\" content=\"Magnus S\" \/>\n<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n<meta name=\"twitter:label1\" content=\"Written by\" \/>\n\t<meta name=\"twitter:data1\" content=\"Magnus S\" \/>\n\t<meta name=\"twitter:label2\" content=\"Est. reading time\" \/>\n\t<meta name=\"twitter:data2\" content=\"3 minutes\" \/>\n<script type=\"application\/ld+json\" class=\"yoast-schema-graph\">{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"Article\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#article\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/\"},\"author\":{\"name\":\"Magnus S\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#\\\/schema\\\/person\\\/1a1186f578c65c1684853105d071ac06\"},\"headline\":\"Kepner-Tregoe Tools and Process Validation\",\"datePublished\":\"2016-06-29T15:22:00+00:00\",\"dateModified\":\"2025-07-10T14:39:49+00:00\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/\"},\"wordCount\":606,\"publisher\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#organization\"},\"image\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_1936499947.jpg\",\"inLanguage\":\"nl\"},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/\",\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/\",\"name\":\"Kepner-Tregoe Tools and Process Validation - Kepner-Tregoe\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#website\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#primaryimage\"},\"image\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#primaryimage\"},\"thumbnailUrl\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_1936499947.jpg\",\"datePublished\":\"2016-06-29T15:22:00+00:00\",\"dateModified\":\"2025-07-10T14:39:49+00:00\",\"description\":\"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.\",\"breadcrumb\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#breadcrumb\"},\"inLanguage\":\"nl\",\"potentialAction\":[{\"@type\":\"ReadAction\",\"target\":[\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/\"]}]},{\"@type\":\"ImageObject\",\"inLanguage\":\"nl\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#primaryimage\",\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_1936499947.jpg\",\"contentUrl\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/shutterstock_1936499947.jpg\",\"width\":1600,\"height\":900},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/kepner-tregoe-tools-and-process-validation\\\/#breadcrumb\",\"itemListElement\":[{\"@type\":\"ListItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/\"},{\"@type\":\"ListItem\",\"position\":2,\"name\":\"Kepner-Tregoe Tools and Process Validation\"}]},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#website\",\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/\",\"name\":\"Kepner-Tregoe\",\"description\":\"Leaders in problem solving\",\"publisher\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#organization\"},\"potentialAction\":[{\"@type\":\"SearchAction\",\"target\":{\"@type\":\"EntryPoint\",\"urlTemplate\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/?s={search_term_string}\"},\"query-input\":{\"@type\":\"PropertyValueSpecification\",\"valueRequired\":true,\"valueName\":\"search_term_string\"}}],\"inLanguage\":\"nl\"},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#organization\",\"name\":\"Kepner-Tregoe\",\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/\",\"logo\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\",\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/kepner-tregoe-logo.png\",\"contentUrl\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/wp-content\\\/uploads\\\/2025\\\/06\\\/kepner-tregoe-logo.png\",\"width\":264,\"height\":38,\"caption\":\"Kepner-Tregoe\"},\"image\":{\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#\\\/schema\\\/logo\\\/image\\\/\"},\"sameAs\":[\"https:\\\/\\\/www.linkedin.com\\\/company\\\/14495\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/#\\\/schema\\\/person\\\/1a1186f578c65c1684853105d071ac06\",\"name\":\"Magnus S\",\"image\":{\"@type\":\"ImageObject\",\"inLanguage\":\"nl\",\"@id\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=ge02393305d89ae7d107a0f08b8285a40\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=g\",\"contentUrl\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=g\",\"caption\":\"Magnus S\"},\"url\":\"https:\\\/\\\/staging.kepner-tregoe.com\\\/nl\\\/blogs\\\/author\\\/magnus_s\\\/\"}]}<\/script>\n<!-- \/ Yoast SEO Premium plugin. -->","yoast_head_json":{"title":"Kepner-Tregoe Tools and Process Validation - Kepner-Tregoe","description":"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.","robots":{"index":"noindex","follow":"follow","max-snippet":"max-snippet:-1","max-image-preview":"max-image-preview:large","max-video-preview":"max-video-preview:-1"},"og_locale":"nl_NL","og_type":"article","og_title":"Kepner-Tregoe Tools and Process Validation","og_description":"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.","og_url":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/","og_site_name":"Kepner-Tregoe","article_published_time":"2016-06-29T15:22:00+00:00","article_modified_time":"2025-07-10T14:39:49+00:00","og_image":[{"width":1600,"height":900,"url":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg","type":"image\/jpeg"}],"author":"Magnus S","twitter_card":"summary_large_image","twitter_misc":{"Written by":"Magnus S","Est. reading time":"3 minutes"},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"Article","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#article","isPartOf":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/"},"author":{"name":"Magnus S","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#\/schema\/person\/1a1186f578c65c1684853105d071ac06"},"headline":"Kepner-Tregoe Tools and Process Validation","datePublished":"2016-06-29T15:22:00+00:00","dateModified":"2025-07-10T14:39:49+00:00","mainEntityOfPage":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/"},"wordCount":606,"publisher":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#organization"},"image":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg","inLanguage":"nl"},{"@type":"WebPage","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/","url":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/","name":"Kepner-Tregoe Tools and Process Validation - Kepner-Tregoe","isPartOf":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#website"},"primaryImageOfPage":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#primaryimage"},"image":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#primaryimage"},"thumbnailUrl":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg","datePublished":"2016-06-29T15:22:00+00:00","dateModified":"2025-07-10T14:39:49+00:00","description":"Controlling process change can be improved, KT methods support three key areas of process validation: planning, installation and qualification.","breadcrumb":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#breadcrumb"},"inLanguage":"nl","potentialAction":[{"@type":"ReadAction","target":["https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/"]}]},{"@type":"ImageObject","inLanguage":"nl","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#primaryimage","url":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg","contentUrl":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/shutterstock_1936499947.jpg","width":1600,"height":900},{"@type":"BreadcrumbList","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/kepner-tregoe-tools-and-process-validation\/#breadcrumb","itemListElement":[{"@type":"ListItem","position":1,"name":"Home","item":"https:\/\/staging.kepner-tregoe.com\/nl\/"},{"@type":"ListItem","position":2,"name":"Kepner-Tregoe Tools and Process Validation"}]},{"@type":"WebSite","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#website","url":"https:\/\/staging.kepner-tregoe.com\/nl\/","name":"Kepner-Tregoe","description":"Leaders in problem solving","publisher":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#organization"},"potentialAction":[{"@type":"SearchAction","target":{"@type":"EntryPoint","urlTemplate":"https:\/\/staging.kepner-tregoe.com\/nl\/?s={search_term_string}"},"query-input":{"@type":"PropertyValueSpecification","valueRequired":true,"valueName":"search_term_string"}}],"inLanguage":"nl"},{"@type":"Organization","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#organization","name":"Kepner-Tregoe","url":"https:\/\/staging.kepner-tregoe.com\/nl\/","logo":{"@type":"ImageObject","inLanguage":"nl","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#\/schema\/logo\/image\/","url":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/kepner-tregoe-logo.png","contentUrl":"https:\/\/staging.kepner-tregoe.com\/wp-content\/uploads\/2025\/06\/kepner-tregoe-logo.png","width":264,"height":38,"caption":"Kepner-Tregoe"},"image":{"@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#\/schema\/logo\/image\/"},"sameAs":["https:\/\/www.linkedin.com\/company\/14495"]},{"@type":"Person","@id":"https:\/\/staging.kepner-tregoe.com\/nl\/#\/schema\/person\/1a1186f578c65c1684853105d071ac06","name":"Magnus S","image":{"@type":"ImageObject","inLanguage":"nl","@id":"https:\/\/secure.gravatar.com\/avatar\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=ge02393305d89ae7d107a0f08b8285a40","url":"https:\/\/secure.gravatar.com\/avatar\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=g","contentUrl":"https:\/\/secure.gravatar.com\/avatar\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=g","caption":"Magnus S"},"url":"https:\/\/staging.kepner-tregoe.com\/nl\/blogs\/author\/magnus_s\/"}]}},"authors":[{"term_id":62,"user_id":17,"is_guest":0,"slug":"magnus_s","display_name":"Magnus S","avatar_url":"https:\/\/secure.gravatar.com\/avatar\/ab477db67ee043e579d7f9f38f54d9457f6706e50d002af47b80531e0727897d?s=96&d=mm&r=g","0":null,"1":"","2":"","3":"","4":"","5":"","6":"","7":"","8":""}],"_links":{"self":[{"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/posts\/24643","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/users\/17"}],"replies":[{"embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/comments?post=24643"}],"version-history":[{"count":1,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/posts\/24643\/revisions"}],"predecessor-version":[{"id":27287,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/posts\/24643\/revisions\/27287"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/media\/496"}],"wp:attachment":[{"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/media?parent=24643"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/categories?post=24643"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/tags?post=24643"},{"taxonomy":"author","embeddable":true,"href":"https:\/\/staging.kepner-tregoe.com\/nl\/wp-json\/wp\/v2\/ppma_author?post=24643"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}